Road paving causes major delays on South Highway 99


Audio|Source: Yamhill County Fire
01:1
Transcript:
BC1. Welcome. BC1 from my home. BC1. BC1, C17 called in, wanted me to advise you that South Highway 99 from a key to vessel is rock paving, shipping something. and have a pilot car traffic has been backed up for over 20 minutes. I copy that, thank you. paving, shipping something, and have a pilot car traffic then backed up for over 20 minutes.
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
Yamhill County, OR
Correct
Incorrect