Train operations halted for cable replacement in DC


Audio|Source: WMATA MetroRail
00:53
Transcript:
We're not going to be 97 in the right track 2 saddle. For a party of four, including myself, to enter the roadway to walk on track 2, track 2 only between 108 and kilo 7. And also I'll be requesting a foul time for our protection. We are going to the wayside for the purpose of ITW cable replacement. simply because we can not say that all of us trying to sign over okay that's a good copy are you requesting file time track 2 between kilo 08 and kilo 07 IDW cable replacement that a good copy over
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
Washington, DC
This shows a Google Street View of the area near the location, which might not be the exact address.
Correct
Incorrect