I have a special presentation. Fancy. 424[1], 412[2], commercial meeting alarm. 6636 West Central at (name withheld). To be a single entry door, 6636 West Central of (name withheld). 424. 424. 424. They're open for business. And 412 can I know. 412, you can I have. Okay.
This is the rest of the 7th, back yet, that agreed, thank you. 1624. Engine 11, obstetrical, 5710 Aspen Drive, Pernat's Village Condos, Channel 3. Engine 11, obstetrical, 5710, Aspen Drive, Pernast Village Condos, Channel 3. Channel 3. Italian 662, is it in the turn lane? Put the turn lane open so they can access right. We'll just shut down this curb lane for the number one lane. Okay. 1627. Science 662. Speedier deployable cones do. Okay, you're okay. You're okay. 1629. That is fast to engine 62. Over 62. Do you know the kind of substance on the ground, what type it is? It just appears to be like a concrete, clay putty, that is dried up and making it slick. It's clear. Have we contacted ODOT yet? On the phone now. Okay, could you see if they have a street cleaner available as well? This match engine 62 ODOT has been notified, stated that they're not exactly sure what type of equipment they have, but they'll inform them of the issue. Okay, Mac 5-631. Thank you, okay. Thank you. 1631. 1731. 1631. 1631. 1631. 1931. 926, take on, Pluto. Magnix, Toledo, 1632. May 16 as well. One thing, one equipment you need. Stayed for a moment. Okay, on the stage. Okay, on the stage. See what you can do about cleaning this section that we're blocking right now, and I'll see how far it goes. But if we can clear off this section, it'll improve things greatly. With McCord and Central, this is a nightmare.
25, we're getting a cancellation can be item 125. 125 item. 125, 5.25, if you push out at 140, the traffic stop, or 126, sorry. 106. 6. Check a 12 problem, north, McCord, and west central. Call it, Calf, East State, just past 6,000 on McCord. There's construction. Say, there's cars blocking lanes because of the backup. There's no rerouting of traffic. It's North McCord and West Central 406. I'm clear.
489, 439, go through robbery alarm[1], 6666, West Central, Chick-fil-A. It's a holdup alarm coming from the left counter, 6636, West Central Chick-fil-A. 489. 489 is in row. 483 is a lot closer, if 439 can hide up. 439, can hide up. 49's on scene, southwest side. Keeps the ear. Unseen, southwest side. 49 dispatch, business as usual. 43 can continue code 2 and go ahead and make the phone call. Business as usual, 483, code 2. Clear code 2.
44, if you could check the area of North McCord and Central. We had engine 62 reporting of black Honda occupied by one, sitting in the middle of the intersection. He then fled when the engine drove by. The license weight's going to be (name withheld), 9686, North McCord, and West Central. 44. And just be sure, did he flee north? Looks like he possibly fled going eastbound on Central. Clear 32, I'll check. Uh, going west on the central from so much. I got you now.