Fire crews manage safety during tower maintenance


Audio|Source: Los Angeles City Fire - Grounds
02:30
Transcript:
Yeah, copy that. We're going to continue all use our resources through. Just make sure you guys have good lockout tag out on any electrical or telecommunication RF or address is shut down. Also, just know when the off ramp is shut down, we'll get off at Sunline and come back up the off ramp network. Yeah, you got a EMS 12 holding traffic on the off ramp. The GEP is still en route. We'll start to handle the utilities while we're here. Yeah, Hitch 24 from East R-Aidate. Is he holding his own weight on the telecommunications tower, i.e. standing on flip bags or anything, or is he being held up by his harness on a ball protection cable? Yeah, he's got bulls in place. He's got flip pegs, and he's in a harness. Pretty comfortable now, relaxing. Copy that, we'll see in a bit. Yeah, I see from Superintendent 4. You got crew 3B and 4A and myself on team. Roger do a face-to-face at Light Force 20. equipment that's all low voltage and they state that there's no chance of that pole being energized. Copy that. Correct. Roger. Uh, unless, as long as the bottom is all wet, you can pick it up. 24, I'll make you, uh, medical or patient care with our risk you want to get it up.
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
Los Angeles, CA
This shows a Google Street View of the area near the location, which might not be the exact address.
Correct
Incorrect