All transcripts, headlines, and summaries are automatically generated by AI from live dispatch audio. These alerts are not an official report. Alerts are based on unconfirmed dispatch communications that may change as situations develop. Review the original audio and verify details with official sources before relying on this information.
Dispatch audio
Heard on: Denver CO Transportation Group Calls · 21 hours ago
00:49
AI transcript
00:00
Yes sir, track two central park station,
00:03
the north side of the station.
AI summaryDiscussions
AI summary
Gate malfunction at Central Park Station
Please note:
This is not an official report. The headline and summary are generated by automated AI systems from public-safety dispatch audio. Always verify with official sources.
As discussed during the dispatch call, dispatchers discussed a pedestrian crossing gate that was partially detached at Central Park Station on the north side of track two. Personnel confirmed that the top part of the gate appeared off its hinge, while the bottom remained attached. The situation may have limited pedestrian access near the crossing.