Traffic control at cedar and st Clair lifted after repair, Collinsville IL
Heads up:
This is auto-generated from real-time dispatch calls. Information may be inaccurate. Listen to the original audio and verify critical information using official agency releases.
According to the dispatch call, traffic control was in place near Cedar and St Clair due to a leak. Ameren contained the leak and repaired it. The road has reopened and the scene is clear.
Audio|Heard on: Collinsville, Maryville Police & Fire
Listen to dispatch call
01:14
Transcript:
00:00
Collinsville dispatch from Ladder 1231.
00:01
I do have Seema on-scene controlling traffic at Cedar and St.
00:06
Clair.
00:07
Copy Cedar at St.
00:08
Clair at (number withheld).
00:16
1231, 1241.
00:19
Go ahead, 41.
00:23
Hammer has released this.
00:25
Tom.
00:31
1241, you can go ahead and release SEMA as well.
00:34
We will open this road back up.
00:40
254.
00:41
Cats updated in service.
00:44
10th where in service.
00:50
Cobbles built for Ladders 1231.
00:53
1231, go ahead.
00:59
All fire units and scene are clear of the scene.
01:03
The street is open back up.
01:06
Ameren does have the leak contained and are working to repair for the problems.
01:12
I have clear units back in service at (number withheld).
Disclaimer:
This transcript was automatically generated and may contain inaccuracies. Please verify the information independently.
Location mentioned:
St Clair Ave, Collinsville, IL 62234
This shows a Google Street View of the area near the location, which might not be the exact address.
Correct
Incorrect
Note:
Auto-generated from live dispatch audio, which may contain errors. Dispatch calls are not confirmed incidents. Always verify with official sources.