Norfolk Southern Bridge over Calumet River requires notice, Cheboygan MI


The Norfolk Southern Railroad Bridge over the Calumet River will need a two-hour advance notice for passage from September 15 to 19, 2025, due to sweeper replacement work.
Audio|Source: Straits Area Marine Radio
00:23
Transcript:
00:00
From September 15th through September 19, 2025, between the hours of 0900 and 1600 daily, the Norfolk Southern Railroad Bridge at mile 136.
00:11
over the Calumet River will require a two-hour advance notice while crews complete the sweeper replacement.
00:18
Mariners should provide advance notice directly to the draw center.
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
Cheboygan, MI 49721
This shows a Google Street View of the area near the location, which might not be the exact address.
Correct
Incorrect